Friday, May 18, 2012

Dining Room Before & After

Before


During


After


Work done:  
  1. Ceiling scraped, patched, and painted
  2. Laminate, baseboards, and bottom 2" of drywall removed, and subfloor treated (cat pee removal)
  3. Trim and walls repainted
  4. Had hardwood floors installed
  5. New chandelier installed

2 comments:

  1. Was it hard to adjust to the change in stripe direction? (LOL) It all looks great ! !

    ReplyDelete
  2. Staci, everything looks *AWESOME*. what a load of work....all worth it!! And I just got caught up on posts...I LOVE THE BEACH one. Coastal getaways are THE BEST...Sun and Surf and Sweet memories...
    Looks wonderful. :-) xo

    ReplyDelete